42-263-31029
Final CompletionWALLACE K
KENT County · District 8 · SMITH PIPE OF ABILENE · POLAR NORTH (ELLENBURGER)
Permits
1
Max Depth
7,974 ft
First Permit
1984-01-20
Latest Activity
1984-01-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-06-09
Shut-In
—
Plugged
1985-10-28
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TXO PRODUCTION CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Operator History
originally filed by TXO PRODUCTION CORP. — asset transferred
Permit Applications (1)
#227054 A TXO PRODUCTION CORP.
received 1984-01-20
Well Details
- Well Number
- 2
- Max Depth
- 7,974 ft
- Drill Type
- Vertical
- County
- KENT
- District
- 8
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1984-06-09
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf