42-263-31110
Final CompletionSELLARS C
KENT County · District 8 · SMITH PIPE OF ABILENE · POLAR (STRAWN)
Permits
1
Max Depth
8,000 ft
First Permit
1985-02-07
Latest Activity
1985-02-07
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-03-17
Shut-In
—
Plugged
1994-10-13
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: G E OPERATING, INC. (reported 1994-05)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TXO PRODUCTION CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-11
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#266276 A TXO PRODUCTION CORP.
received 1985-02-07
Well Details
- Well Number
- 2
- Max Depth
- 8,000 ft
- Drill Type
- Vertical
- County
- KENT
- District
- 8
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-03-17
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf