42-275-31101

Final Completion

LOGAN NEAL

KNOX County · District 9 · SMITH PIPE OF ABILENE · BIG FOUR (TANNEHILL)

RRC Lookup

Permits

1

Max Depth

2,400 ft

First Permit

1981-10-30

Latest Activity

1981-10-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-08-01

Shut-In

Plugged

1996-11-04

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: JLA RESOURCES COMPANY (reported 1998-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BREWER, TIM INC

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-06

Operator History

originally filed by BREWER, TIM INC — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#139207 A BREWER, TIM INC
received 1981-10-30

Well Details

Well Number
60-2
Max Depth
2,400 ft
Drill Type
Vertical
County
KNOX
District
9
Completed
1983-08-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora