42-275-31165
Final CompletionLOGAN NEAL
KNOX County · District 9 · SMITH PIPE OF ABILENE · BIG FOUR (TANNEHILL)
Permits
1
Max Depth
2,200 ft
First Permit
1982-03-03
Latest Activity
1982-03-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-04-25
Shut-In
—
Plugged
2003-04-23
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: JLA RESOURCES COMPANY (reported 1998-03)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BREWER, TIM INC
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-06
Operator History
originally filed by BREWER, TIM INC — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#152160 A BREWER, TIM INC
received 1982-03-03
Well Details
- Well Number
- 60-3
- Max Depth
- 2,200 ft
- Drill Type
- Vertical
- County
- KNOX
- District
- 9
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1982-04-25
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf