42-285-31174

PRODUCING

HATHAWAY EDWARDS GAS UNIT

LAVACA County · District 2 · CAPITAL STAR OIL & GAS INC. · WORD N. (EDWARDS)

RRC Lookup

Permits

4

Max Depth

10,400 ft

First Permit

1977-09-21

Latest Activity

1979-01-16

Lifespan

1 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

1979-03-11

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: CAPITAL STAR OIL & GAS INC. ≠ Permit: HOWELL DRILLING, INC.

Resolved via: productionCAPITAL STAR OIL & GAS, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#40950 A HOWELL DRILLING, INC.
received 1979-01-16
#9614 A HOWELL DRILLING, INC.
received 1977-10-12
#8408 A HOWELL DRILLING, INC.
received 1977-09-26
#4752 A HOWELL DRILLING, INC.
received 1977-09-21

Well Details

Well Number
2
Max Depth
10,400 ft
Drill Type
Vertical
County
LAVACA
District
2
Completed
1979-03-11

Operator

Location
HOUSTON
P-5 Status
Y (filed 2026-01-04)
Cum Oil (all leases)
274,028 bbl
Cum Gas (all leases)
95,700,469 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
48

External Links

Live © 2026 Petrora