42-285-32466

Final Completion

JACOBS RANCH

LAVACA County · District 2 · XTO ENERGY INC. · SPEAKS ( 1900)

RRC Lookup

Permits

3

Max Depth

3,600 ft

First Permit

1997-03-13

Latest Activity

1999-05-04

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-07-17

Shut-In

Plugged

2012-08-03

!

EWA / Production operator mismatch

Scheduling: XTO ENERGY INC. ≠ Production: DREYFUS, LOUIS NATURAL GAS CORP (reported 2000-04)

!

EWA / Permit operator mismatch

Scheduling: XTO ENERGY INC. ≠ Permit: DREYFUS, LOUIS NATURAL GAS CORP

Resolved via: schedulingXTO ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-07

Last Production

2012-08

Operator History

originally filed by DREYFUS, LOUIS NATURAL GAS CORP — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#484294 A DREYFUS, LOUIS NATURAL GAS CORP
received 1999-05-04
#459851 A DREYFUS, LOUIS NATURAL GAS CORP
received 1997-08-14
#459851 A DREYFUS, LOUIS NATURAL GAS CORP
received 1997-03-13

Well Details

Well Number
2
Max Depth
3,600 ft
Drill Type
Vertical
County
LAVACA
District
2
Completed
1997-07-17

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora