42-287-31596
Final CompletionZSCHECK
LEE County · District 3 · B.I. OPERATING · HOOKER CREEK (NAVARRO A)
Permits
1
Max Depth
5,200 ft
First Permit
1984-04-03
Latest Activity
1984-04-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-05-07
Shut-In
—
Plugged
1997-07-22
!
EWA / Permit operator mismatch
Scheduling: B.I. OPERATING ≠ Permit: AUSTIN OIL & MINERAL
Resolved via: scheduling → B.I. OPERATING
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by AUSTIN OIL & MINERAL — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#234382 A AUSTIN OIL & MINERAL
received 1984-04-02
Well Details
- Well Number
- 1
- Max Depth
- 5,200 ft
- Drill Type
- Vertical
- County
- LEE
- District
- 3
- Operator
- B.I. OPERATING
- Completed
- 1984-05-07
Operator
- Name
- B.I. OPER
- Location
- AUSTIN
- P-5 Status
- Y (filed 1997-01-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 1