42-291-30663

U

CROW W.C.

LIBERTY County · District 3 · GAITHER PETROLEUM CORPORATION · HANKAMER (MIOCENE SAND)

RRC Lookup

Permits

2

Max Depth

5,300 ft

First Permit

1977-10-31

Latest Activity

1985-02-19

Lifespan

7 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-03-01

Shut-In

Plugged

2013-12-03

!

EWA / Permit operator mismatch

Scheduling: GAITHER PETROLEUM CORPORATION ≠ Permit: TEMPLETON OIL, INC.

Resolved via: schedulingGAITHER PETROLEUM CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2025-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#267225 A TEMPLETON OIL, INC.
received 1985-02-15
#10983 A TEMPLETON OIL, INC.
received 1977-10-31

Well Details

Well Number
3
Max Depth
5,300 ft
Drill Type
Vertical
County
LIBERTY
District
3
Completed
1985-03-01

Operator

Location
KATY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
7,032,009 bbl
Cum Gas (all leases)
20,920,536 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
117

External Links

Live © 2026 Petrora