42-293-30484

Final Completion

L.D. CROSS TRUSTEE UNIT

LIMESTONE County · District 5 · AL-TX OPERATING INC. · THORNTON S. (RODESSA)

RRC Lookup

Permits

2

Max Depth

10,129 ft

First Permit

1980-01-24

Latest Activity

1990-04-20

Lifespan

10 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-03-06

Shut-In

Plugged

1994-03-11

!

EWA / Permit operator mismatch

Scheduling: AL-TX OPERATING INC. ≠ Permit: APACHE CORPORATION

Resolved via: schedulingAL-TX OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-05

Operator History

originally filed by APACHE CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#372336 A APACHE CORPORATION
received 1990-04-19
#70901 A BLOCKER EXPLORATION CO.
received 1980-01-24

Well Details

Well Number
1
Max Depth
10,129 ft
Drill Type
Vertical
County
LIMESTONE
District
5
Completed
1990-03-06

Operator

Location
PLUM
P-5 Status
Y (filed 1998-11-06)
Cum Oil (all leases)
559 bbl
Cum Gas (all leases)
67 mcf

External Links

Live © 2026 Petrora