42-293-31008
TEMP ABANDONEDYARBROUGH
LIMESTONE County · District 5 · LODESTONE OPERATING INC. · OLETHA (TRAVIS PEAK)
Permits
2
Max Depth
9,600 ft
First Permit
1993-06-08
Latest Activity
2010-10-26
Lifespan
17 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
1999-01-07
Shut-In
—
Plugged
—
P-5 Org Status: X
EWA / Production operator mismatch
Scheduling: LODESTONE OPERATING INC. ≠ Production: SKLAR & PHILLIPS OIL CO. (reported 1996-12)
EWA / Permit operator mismatch
Scheduling: LODESTONE OPERATING INC. ≠ Permit: MARATHON OIL COMPANY
Resolved via: scheduling → LODESTONE OPERATING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-08
Last Production
2026-03
Operator History
originally filed by MARATHON OIL COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
Well Details
- Well Number
- 1
- Max Depth
- 9,600 ft
- Drill Type
- Vertical
- County
- LIMESTONE
- District
- 5
- Operator
- LODESTONE OPERATING INC.
- Completed
- 1999-01-07
Operator
- Location
- PORTLAND
- P-5 Status
- Y (filed 2025-07-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- 318,277 mcf
- Activities
- OPRS/G, OPRS/O