42-295-33360

Final Completion

PAINE

LIPSCOMB County · District 10 · CHI OPERATING INC. · WILEY (TONKAWA)

RRC Lookup

Permits

2

Max Depth

11,000 ft

First Permit

2008-06-21

Latest Activity

2008-06-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2009-02-11

Shut-In

Plugged

2017-09-06

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-02

Last Production

2022-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#663607 A CHI OPERATING, INC.
received 2009-01-22
#663607 A CHI OPERATING, INC.
received 2008-06-03

Well Details

Well Number
1
Max Depth
11,000 ft
Drill Type
Vertical
County
LIPSCOMB
District
10
Completed
2009-02-11

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
2,269,596 bbl
Cum Gas (all leases)
4,848,473 mcf
Activities
OPRS/G, OPRS/O
Total Permits
126

External Links

Live © 2026 Petrora