42-297-33377

Final Completion

HARRIS -N-

LIVE OAK County · District 2 · BRIDGE OIL COMPANY L. P. · HARRIS NE. (MASSIVE SEG. C)

RRC Lookup

Permits

2

Max Depth

11,000 ft

First Permit

1983-11-17

Latest Activity

1992-12-18

Lifespan

9 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-03-21

Shut-In

Plugged

1996-10-07

!

EWA / Production operator mismatch

Scheduling: BRIDGE OIL COMPANY L. P. ≠ Production: VALLEY GATHERING COMPANY (reported 1995-10)

!

EWA / Permit operator mismatch

Scheduling: BRIDGE OIL COMPANY L. P. ≠ Permit: BRIDGE OIL PRODUCTION CO., INC.

Resolved via: schedulingBRIDGE OIL COMPANY L. P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#407234 A BRIDGE OIL PRODUCTION CO., INC.
received 1992-12-14
#220855 A TXO PRODUCTION CORP.
received 1984-03-28
#220855 A TXO PRODUCTION CORP.
received 1983-11-15

Well Details

Well Number
1
Max Depth
11,000 ft
Drill Type
Vertical
County
LIVE OAK
District
2
Completed
1984-03-21

Operator

Location
MIDLAND
P-5 Status
Y (filed 1994-10-10)
Cum Oil (all leases)
1,527,111 bbl
Cum Gas (all leases)
41,172,958 mcf
Total Permits
146

External Links

Live © 2026 Petrora