42-301-30588

Final Completion

BRUNSON-TENNECO -A-

LOVING County · District 8 · PROPEL ENERGY SERVICES LLC · PINAL DOME (CHERRY CANYON)

RRC Lookup

Permits

1

Max Depth

6,900 ft

First Permit

1984-08-24

Latest Activity

1984-08-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-12-28

Shut-In

Plugged

!

EWA / Permit operator mismatch

Scheduling: PROPEL ENERGY SERVICES LLC ≠ Permit: HANLEY PETROLEUM INC.

Resolved via: schedulingPROPEL ENERGY SERVICES LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by HANLEY PETROLEUM INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#249592 A HANLEY PETROLEUM INC.
received 1984-11-09
#249592 A HANLEY PETROLEUM INC.
received 1984-08-20

Well Details

Well Number
1
Max Depth
6,900 ft
Drill Type
Vertical
County
LOVING
District
8
Completed
1986-12-28

Operator

Location
HOUSTON
P-5 Status
Y (filed 2014-04-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
1

External Links

Live © 2026 Petrora