ROSS SWD
LOVING County · District 8 · PILOT WATER GATH DELAWARE LLC · DIMMITT (DELAWARE)
Permits
2
Max Depth
7,750 ft
First Permit
2019-05-10
Latest Activity
2021-05-18
Lifespan
2 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2021-07-27
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: PILOT WATER GATH DELAWARE LLC ≠ Permit: INTREPID POTASH-NEW MEXICO, LLC
Resolved via: scheduling → PILOT WATER GATH DELAWARE LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2021-07
Last Production
2026-03
Operator History
originally filed by INTREPID POTASH-NEW MEXICO, LLC — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#869786 A INTREPID POTASH-NEW MEXICO, LLC
received 2021-05-11
#852906 A BOYKIN ENERGY LLC
received 2019-05-08
Lat 31.990178
Lon -103.358239
Well Details
- Well Number
- 2
- Max Depth
- 7,750 ft
- Drill Type
- Vertical
- County
- LOVING
- District
- 8
- Operator
- PILOT WATER GATH DELAWARE LLC
- Completed
- 2021-07-27
Operator
- Location
- HOUSTON
- P-5 Status
- Y (filed 2026-03-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 58