42-301-36333

INJECTION [SWD] Water

SKYNYRD SWD

LOVING County · District 8 · DEVON ENERGY PRODUCTION CO L.P. · PONDITO (CHERRY CANYON)

RRC Lookup

Permits

1

Max Depth

7,700 ft

First Permit

2023-03-31

Latest Activity

2023-03-31

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2023-10-21

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: DEVON ENERGY PRODUCTION CO L.P. ≠ Permit: WATERBRIDGE STATELINE LLC

Resolved via: schedulingDEVON ENERGY PRODUCTION CO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-10

Last Production

2026-03

Operator History

originally filed by WATERBRIDGE STATELINE LLC — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#889448 A WATERBRIDGE STATELINE LLC
received 2023-03-30
Lat 31.834292
Lon -103.742745

Well Details

Well Number
1
Max Depth
7,700 ft
Drill Type
Vertical
County
LOVING
District
8
Completed
2023-10-21

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
360,504,673 bbl
Cum Gas (all leases)
9,266,199,431 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,223

External Links

Live © 2026 Petrora