42-311-31931

Final Completion

DISCHER

MCMULLEN County · District 1 · SOUTH TEXAS INSTRUMENTS INC. · TILDEN E. (300)

RRC Lookup

Permits

1

Max Depth

900 ft

First Permit

1983-09-27

Latest Activity

1983-09-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-03-02

Shut-In

Plugged

2013-03-19

!

EWA / Permit operator mismatch

Scheduling: SOUTH TEXAS INSTRUMENTS INC. ≠ Permit: THORNE, JAMES R.

Resolved via: schedulingSOUTH TEXAS INSTRUMENTS INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2013-08

Operator History

originally filed by THORNE, JAMES R. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#215015 A THORNE, JAMES R.
received 1983-08-31

Well Details

Well Number
1
Max Depth
900 ft
Drill Type
Vertical
County
MCMULLEN
District
1
Completed
1984-03-02

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2015-08-07)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
1

External Links

Live © 2026 Petrora