42-311-33006
Final CompletionSPICE GAS UNIT
MCMULLEN County · District 1 · CABOT OIL & GAS CORPORATION · HOSTETTER (WILCOX 10300)
Permits
1
Max Depth
11,000 ft
First Permit
1993-09-28
Latest Activity
1993-09-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1993-12-06
Shut-In
—
Plugged
2011-08-23
EWA / Production operator mismatch
Scheduling: CABOT OIL & GAS CORPORATION ≠ Production: TEXACO E & P INC. (reported 1998-01)
EWA / Permit operator mismatch
Scheduling: CABOT OIL & GAS CORPORATION ≠ Permit: TEXACO E & P INC.
Resolved via: scheduling → CABOT OIL & GAS CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-12
Last Production
2011-08
Operator History
originally filed by TEXACO E & P INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
Well Details
- Well Number
- 4
- Max Depth
- 11,000 ft
- Drill Type
- Vertical
- County
- MCMULLEN
- District
- 1
- Operator
- CABOT OIL & GAS CORPORATION
- Completed
- 1993-12-06
Operator
- Location
- HOUSTON
- P-5 Status
- Y (filed 2022-01-07)
- Cum Oil (all leases)
- 26,968,623 bbl
- Cum Gas (all leases)
- 381,996,090 mcf
- Total Permits
- 1,040