42-315-30729

Final Completion

HILL NELSON GAS UNIT

MARION County · District 6 · SCHNEIDER ENERGY EXPLORATION INC · GREEN FOX E. (TRAVIS PEAK)

RRC Lookup

Permits

4

Max Depth

6,500 ft

First Permit

1987-08-10

Latest Activity

1992-01-07

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-12-14

Shut-In

Plugged

2017-11-16

!

EWA / Production operator mismatch

Scheduling: SCHNEIDER ENERGY EXPLORATION INC ≠ Production: TEXLA OPERATING COMPANY (reported 2012-01)

!

EWA / Permit operator mismatch

Scheduling: SCHNEIDER ENERGY EXPLORATION INC ≠ Permit: JAMEX, INC.

Resolved via: schedulingSCHNEIDER ENERGY EXPLORATION INC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#395520 A JAMEX, INC.
received 1991-12-31
#332815 A SCHNEIDER ENERGY EXPLORATION,INC
received 1988-02-12
#332815 A SCHNEIDER ENERGY EXPLORATION,INC
received 1987-10-08
#332815 A SCHNEIDER ENERGY EXPLORATION,INC
received 1987-07-13

Well Details

Well Number
1
Max Depth
6,500 ft
Drill Type
Vertical
County
MARION
District
6
Completed
1987-12-14

Operator

Location
DALLAS
P-5 Status
Y (filed 1989-09-15)
Total Permits
20

External Links

Live © 2026 Petrora