42-315-30911

PRODUCING

WAKEFIELD

MARION County · District 6 · FAULCONER ENERGY LLC · RODESSA (COTTON VALLEY CONS.)

RRC Lookup

Permits

4

Max Depth

8,600 ft

First Permit

2004-12-13

Latest Activity

2010-05-10

Lifespan

5 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2011-11-09

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: FAULCONER ENERGY LLC ≠ Permit: XTO ENERGY INC.

Resolved via: productionFAULCONER ENERGY, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2005-04

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#695631 A XTO ENERGY INC.
received 2010-05-07
#607159 A NADEL AND GUSSMAN, L.L.C.
received 2005-09-29
#552204 A NADEL AND GUSSMAN, L.L.C.
received 2005-06-17
#552204 A NADEL AND GUSSMAN, L.L.C.
received 2004-10-12

Well Details

Well Number
2
Max Depth
8,600 ft
Drill Type
Vertical
County
MARION
District
6
Completed
2011-11-09

Operator

Location
TYLER
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
344,817 bbl
Cum Gas (all leases)
64,700,023 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
37

External Links

Live © 2026 Petrora