42-317-32025

Final Completion

MABEE -A-

MARTIN County · District 8 · HENRY PETROLEUM CORP. · SPRABERRY(TREND AREA DEAN-WLFCP)

RRC Lookup

Permits

1

Max Depth

9,800 ft

First Permit

1978-08-09

Latest Activity

1978-08-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-03-17

Shut-In

Plugged

2020-08-14

!

EWA / Production operator mismatch

Scheduling: HENRY PETROLEUM CORP. ≠ Production: EXTEX OPERATING COMPANY (reported 2025-12)

Resolved via: productionEXTEX OPERATING COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#30245 A HENRY PETROLEUM CORP.
received 1978-08-09

Well Details

Well Number
1
Max Depth
9,800 ft
Drill Type
Vertical
County
MARTIN
District
8
Completed
1979-03-17

Operator

Location
MIDLAND
P-5 Status
Y (filed 2001-02-09)
Cum Oil (all leases)
13,111,502 bbl
Cum Gas (all leases)
352,392 mcf
Total Permits
537

External Links

Live © 2026 Petrora