42-321-31898

Final Completion

TIN TOP

MATAGORDA County · District 3 · HOLLIMON OIL CORPORATION · PALACIOS (FRIO 9300)

RRC Lookup

Permits

1

Max Depth

10,500 ft

First Permit

2001-08-07

Latest Activity

2001-08-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2001-10-22

Shut-In

Plugged

2007-06-26

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-10

Last Production

2007-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#512199 A HOLLIMON OIL CORPORATION
received 2001-08-03

Well Details

Well Number
1
Max Depth
10,500 ft
Drill Type
Vertical
County
MATAGORDA
District
3
Completed
2001-10-22

Operator

Location
CASTROVILLE
P-5 Status
Y (filed 2016-02-05)
Cum Oil (all leases)
1,135,935 bbl
Cum Gas (all leases)
59,557,094 mcf
Total Permits
262

External Links

Live © 2026 Petrora