42-323-31512

Final Completion

HALSELL FOUNDATION 97

MAVERICK County · District 1 · BRUNER ENERGY INC. · SACATOSA (SAN MIGUEL #1 SAND)

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

1979-12-17

Latest Activity

1979-12-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-05-21

Shut-In

Plugged

1991-11-05

!

EWA / Permit operator mismatch

Scheduling: BRUNER ENERGY INC. ≠ Permit: PETRO GULF, INC.

Resolved via: schedulingBRUNER ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by PETRO GULF, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#67047 A PETRO GULF, INC.
received 1979-12-17

Well Details

Well Number
B7
Max Depth
2,000 ft
Drill Type
Vertical
County
MAVERICK
District
1
Completed
1981-05-21

Operator

Location
DALLAS
P-5 Status
Y (filed 1992-04-01)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora