42-329-01920

PARKS ROY -B- TG

MIDLAND County · District 8 · ANADARKO PETROLEUM CORPORATION · DORA ROBERTS (PENNSYLVANIAN)

RRC Lookup

Permits

1

Max Depth

13,190 ft

First Permit

1978-06-12

Latest Activity

1978-06-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-12-05

Shut-In

Plugged

1995-02-21

!

EWA / Permit operator mismatch

Scheduling: ANADARKO PETROLEUM CORPORATION ≠ Permit: ATLANTIC RICHFIELD CO.

Resolved via: schedulingANADARKO PETROLEUM CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-12

Operator History

originally filed by ATLANTIC RICHFIELD CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#26272 A ATLANTIC RICHFIELD CO.
received 1978-06-12

Well Details

Well Number
11
Max Depth
13,190 ft
Drill Type
Vertical
County
MIDLAND
District
8
Completed
1990-12-05

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
73,560,813 bbl
Cum Gas (all leases)
1,723,441,403 mcf
Total Permits
4,004

External Links

Live © 2026 Petrora