42-329-31726

Final Completion

HALE 1-Y

MIDLAND County · District 8 · BRECK OPERATING CORP. · MID-MAR EAST (STRAWN)

RRC Lookup

Permits

2

Max Depth

12,000 ft

First Permit

1986-07-15

Latest Activity

1986-07-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-09-29

Shut-In

Plugged

2012-07-24

!

EWA / Permit operator mismatch

Scheduling: BRECK OPERATING CORP. ≠ Permit: TEMPO ENERGY, INC.

Resolved via: schedulingBRECK OPERATING CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2013-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#304197 A TEMPO ENERGY, INC.
received 1986-10-08
#304197 Withdrawn TEMPO ENERGY, INC.
received 1986-10-02
#304197 A TEMPO ENERGY, INC.
received 1986-07-14

Well Details

Well Number
1Y
Max Depth
12,000 ft
Drill Type
Vertical
County
MIDLAND
District
8
Completed
1986-09-29

Operator

Location
BRECKENRIDG
P-5 Status
Y (filed 2019-03-08)
Cum Oil (all leases)
7,128,788 bbl
Cum Gas (all leases)
28,557,632 mcf
Total Permits
295

External Links

Live © 2026 Petrora