42-331-32748
Final CompletionCOFFIELD/CULPEPPER -A-
MILAM County · District 1 · NELSON-DEAN ENERGY · MINERVA-ROCKDALE
Permits
1
Max Depth
600 ft
First Permit
1984-12-28
Latest Activity
1984-12-28
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-01-10
Shut-In
—
Plugged
2001-08-20
!
EWA / Production operator mismatch
Scheduling: NELSON-DEAN ENERGY ≠ Production: EC OIL CO. (reported 1997-03)
Resolved via: scheduling → NELSON-DEAN ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#262622 A NELSON-DEAN ENERGY
received 1984-12-28
Well Details
- Well Number
- 1
- Max Depth
- 600 ft
- Drill Type
- Vertical
- County
- MILAM
- District
- 1
- Operator
- NELSON-DEAN ENERGY
- Completed
- 1985-01-10
Operator
- Name
- NELSON-DEAN ENGY
- Location
- CAMERON
- P-5 Status
- Y (filed 1985-10-15)
- Total Permits
- 4