42-337-31238
Final CompletionORTON (CADDO) UNIT
MONTAGUE County · District 9 · SMITH PIPE OF ABILENE · ORTON (CADDO)
Permits
1
Max Depth
1,800 ft
First Permit
1979-07-09
Latest Activity
1979-07-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-05-15
Shut-In
—
Plugged
1999-03-01
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: MITCHELL ENERGY CORPORATION (reported 1998-07)
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BORDERS, DELBERT L. INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1999-09
Operator History
originally filed by BORDERS, DELBERT L. INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
Well Details
- Well Number
- 5WS
- Max Depth
- 1,800 ft
- Drill Type
- Vertical
- County
- MONTAGUE
- District
- 9
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1979-05-15
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf