42-345-30268

PRODUCING

MATADOR

MOTLEY County · District 8 · SUTHERLAND ENERGY CO. LLC · MATADOR (WOLFCAMP)

RRC Lookup

Permits

3

Max Depth

4,400 ft

First Permit

1993-11-16

Latest Activity

1994-09-26

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2003-04-01

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: SUTHERLAND ENERGY CO. LLC ≠ Permit: P. L. O.

Resolved via: productionSUTHERLAND ENERGY CO., LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#428261 A P. L. O.
received 1994-11-29
#428261 A P. L. O.
received 1994-09-21
#418292 A ROGERS, S. K. OIL INC.
received 1993-11-16

Well Details

Well Number
2
Max Depth
4,400 ft
Drill Type
Vertical
County
MOTLEY
District
8
Completed
2003-04-01

Operator

Location
BRIDGEPORT
P-5 Status
Y (filed 2026-03-04)
Cum Oil (all leases)
998,271 bbl
Cum Gas (all leases)
213,718 mcf
Activities
CSGD/G, CSGD/P, G/PUR, OPRS/G, OPRS/O
Total Permits
18

External Links

Live © 2026 Petrora