42-349-32899
Final CompletionNANNEN
NAVARRO County · District 5 · ARIEL ENERGY INC. · CORSICANA (SHALLOW)
Permits
1
Max Depth
1,000 ft
First Permit
1982-09-24
Latest Activity
1982-09-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-04-12
Shut-In
—
Plugged
1992-07-30
!
EWA / Permit operator mismatch
Scheduling: ARIEL ENERGY INC. ≠ Permit: ANARENE PRODUCTION CO. INC.
Resolved via: scheduling → ARIEL ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1993-02
Operator History
originally filed by ANARENE PRODUCTION CO. INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#172769 A ANARENE PRODUCTION CO. INC.
received 1982-09-24
Well Details
- Well Number
- 02
- Max Depth
- 1,000 ft
- Drill Type
- Vertical
- County
- NAVARRO
- District
- 5
- Operator
- ARIEL ENERGY INC.
- Completed
- 1984-04-12
Operator
- Name
- ARIEL ENGY, INC
- Location
- DALLAS
- P-5 Status
- Y (filed 1992-05-05)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 1