42-351-30904
INJECTIONHANKAMER-TRAM
NEWTON County · District 3 · WELL-CO SOLUTIONS LLC · SABINE TRAM (WILCOX 2)
Permits
2
Max Depth
15,000 ft
First Permit
2014-05-19
Latest Activity
2014-05-19
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2016-06-13
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Production operator mismatch
Scheduling: WELL-CO SOLUTIONS LLC ≠ Production: OLIPDP II, LLC (reported 2025-09)
!
EWA / Permit operator mismatch
Scheduling: WELL-CO SOLUTIONS LLC ≠ Permit: UNIT PETROLEUM COMPANY
Resolved via: production → OLIPDP II, LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2014-03
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#784673 A UNIT PETROLEUM COMPANY
received 2014-09-30
#784673 A UNIT PETROLEUM COMPANY
received 2014-04-15
Well Details
- Well Number
- 2
- Max Depth
- 15,000 ft
- Drill Type
- Vertical
- County
- NEWTON
- District
- 3
- Operator
- WELL-CO SOLUTIONS LLC
- Completed
- 2016-06-13
Operator
- Location
- BATSON
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 6,345 bbl
- Cum Gas (all leases)
- 1,849 mcf
- Activities
- OPRS/G, OPRS/O