42-353-00016
Final CompletionMCELMURRAY A.H.
NOLAN County · District 7 · CEDAR OIL COMPANY · WHITE FLAT (STRAWN)
Permits
1
Max Depth
6,142 ft
First Permit
1986-01-14
Latest Activity
1986-01-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1986-02-11
Shut-In
—
Plugged
1992-12-19
!
EWA / Permit operator mismatch
Scheduling: CEDAR OIL COMPANY ≠ Permit: ATAPCO
Resolved via: production → CEDAR OIL COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#295239 A ATAPCO
received 1986-01-14
Well Details
- Well Number
- 1
- Max Depth
- 6,142 ft
- Drill Type
- Vertical
- County
- NOLAN
- District
- 7
- Operator
- CEDAR OIL COMPANY
- Completed
- 1986-02-11
Operator
- Name
- CEDAR OIL CO
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-12-04)
- Cum Oil (all leases)
- 598,706 bbl
- Cum Gas (all leases)
- 343,580 mcf
- Activities
- OPRS/O
- Total Permits
- 75