42-353-00673

Final Completion

CRAIN ET UX

NOLAN County · District 7 · TEXAS UNITED GEOPRODUCTION INC. · GROUP (4000)

RRC Lookup

Permits

1

Max Depth

4,200 ft

First Permit

1989-11-15

Latest Activity

1989-11-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-01-29

Shut-In

Plugged

1993-09-23

!

EWA / Permit operator mismatch

Scheduling: TEXAS UNITED GEOPRODUCTION INC. ≠ Permit: ACME PRODUCTION CO. OF ABILENE

Resolved via: schedulingTEXAS UNITED GEOPRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-10

Operator History

originally filed by ACME PRODUCTION CO. OF ABILENE — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#366297 A ACME PRODUCTION CO. OF ABILENE
received 1989-11-10

Well Details

Well Number
1
Max Depth
4,200 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1990-01-29

Operator

Location
ABILENE
P-5 Status
Y (filed 2015-11-06)
Cum Oil (all leases)
71,403 bbl
Cum Gas (all leases)
114,459 mcf
Total Permits
86

External Links

Live © 2026 Petrora