42-353-10037

Final Completion

HAMON-WALLACE

NOLAN County · District 7 · TDC ENGINEERING INC. · HETTYE (ELLENBURGER)

RRC Lookup

Permits

2

Max Depth

7,500 ft

First Permit

1995-04-24

Latest Activity

1995-04-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-08-01

Shut-In

Plugged

1996-01-09

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-08

Last Production

1996-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#435067 A TDC ENGINEERING, INC.
received 1995-08-21
#435067 A TDC ENGINEERING, INC.
received 1995-04-21

Well Details

Well Number
1
Max Depth
7,500 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1995-08-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora