42-353-31320

Final Completion

JAMESON H

NOLAN County · District 7 · PARIS PETROLEUM CORPORATION · SILVER (CANYON)

RRC Lookup

Permits

1

Max Depth

6,500 ft

First Permit

1982-06-03

Latest Activity

1982-06-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-08-10

Shut-In

Plugged

1992-06-03

!

EWA / Permit operator mismatch

Scheduling: PARIS PETROLEUM CORPORATION ≠ Permit: GRAHAM ENERGY, LTD.

Resolved via: schedulingPARIS PETROLEUM CORPORATION

Operator History

originally filed by GRAHAM ENERGY, LTD. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#162681 A GRAHAM ENERGY, LTD.
received 1982-06-03

Well Details

Well Number
2
Max Depth
6,500 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1982-08-10

Operator

Location
BELLAIRE
P-5 Status
Y (filed 1997-11-07)
Cum Oil (all leases)
635 bbl
Cum Gas (all leases)
35,653 mcf
Total Permits
5

External Links

Live © 2026 Petrora