42-353-31767
Final CompletionDRIGGERS
NOLAN County · District 7 · SMITH PIPE OF ABILENE · LAKE SWEETWATER (STRAWN)
Permits
1
Max Depth
6,300 ft
First Permit
1985-02-15
Latest Activity
1985-02-15
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-04-19
Shut-In
—
Plugged
1997-04-29
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: CLEAR FORK, INCORPORATED (reported 1995-09)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TXO PRODUCTION CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1997-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#267009 A TXO PRODUCTION CORP.
received 1985-02-15
Well Details
- Well Number
- 2
- Max Depth
- 6,300 ft
- Drill Type
- Vertical
- County
- NOLAN
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-04-19
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf