42-353-31767

Final Completion

DRIGGERS

NOLAN County · District 7 · SMITH PIPE OF ABILENE · LAKE SWEETWATER (STRAWN)

RRC Lookup

Permits

1

Max Depth

6,300 ft

First Permit

1985-02-15

Latest Activity

1985-02-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-04-19

Shut-In

Plugged

1997-04-29

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: CLEAR FORK, INCORPORATED (reported 1995-09)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TXO PRODUCTION CORP.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#267009 A TXO PRODUCTION CORP.
received 1985-02-15

Well Details

Well Number
2
Max Depth
6,300 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1985-04-19

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora