42-353-31781
Final CompletionWELLS FRANCES H. A
NOLAN County · District 7 · FULLER ENERGY INC. · LAKE TRAMMEL S. (CANYON)
Permits
1
Max Depth
5,700 ft
First Permit
1985-03-07
Latest Activity
1985-03-07
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-05-06
Shut-In
—
Plugged
1994-03-10
!
EWA / Permit operator mismatch
Scheduling: FULLER ENERGY INC. ≠ Permit: NEWHALL RESOURCES
Resolved via: scheduling → FULLER ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-03
Operator History
originally filed by NEWHALL RESOURCES — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#268941 A NEWHALL RESOURCES
received 1985-03-06
Well Details
- Well Number
- 1
- Max Depth
- 5,700 ft
- Drill Type
- Vertical
- County
- NOLAN
- District
- 7
- Operator
- FULLER ENERGY INC.
- Completed
- 1985-05-06
Operator
- Name
- FULLER ENGY, INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 1996-04-05)
- Cum Oil (all leases)
- 107,408 bbl
- Cum Gas (all leases)
- 920,490 mcf
- Total Permits
- 10