42-353-32088

Final Completion

SIMMONS

NOLAN County · District 7 · SMITH PIPE OF ABILENE · HARDROCK (STRAWN REEF)

RRC Lookup

Permits

1

Max Depth

6,999 ft

First Permit

1988-09-09

Latest Activity

1988-09-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-03-27

Shut-In

Plugged

1993-09-27

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: KINLAW OIL CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-10

Operator History

originally filed by KINLAW OIL CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#351014 A KINLAW OIL CORPORATION
received 1988-09-09

Well Details

Well Number
1
Max Depth
6,999 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
1991-03-27

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora