42-353-32577

Final Completion Directional

MORROW

NOLAN County · District 7 · ADKINS R. L. CORP. · WEAVER SPRINGS (PALO PINTO)

RRC Lookup

Permits

2

Max Depth

5,900 ft

First Permit

1997-07-28

Latest Activity

2000-01-18

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-10-18

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: ADKINS R. L. CORP. ≠ Production: HALLWOOD PETROLEUM, INC. (reported 1999-04)

Resolved via: schedulingADKINS R. L. CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-10

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#491151 A ADKINS, R. L. CORP.
received 2000-01-18
#465492 Withdrawn HALLWOOD PETROLEUM, INC.
received 1997-12-08
#465492 A HALLWOOD PETROLEUM, INC.
received 1997-07-28

Well Details

Well Number
5
Max Depth
5,900 ft
Drill Type
Directional
County
NOLAN
District
7
Completed
1997-10-18

Operator

Location
LUBBOCK
P-5 Status
Y (filed 2013-10-04)
Cum Oil (all leases)
2,031,919 bbl
Cum Gas (all leases)
10,818,352 mcf
Total Permits
395

External Links

Live © 2026 Petrora