42-353-32638

PRODUCING

CHERRY WRIGHT

NOLAN County · District 7 · TDC ENGINEERING INC. · CHERRY ON TOP (STRAWN REEF)

RRC Lookup

Permits

3

Max Depth

7,500 ft

First Permit

1994-12-30

Latest Activity

2025-04-01

Lifespan

30 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2025-06-26

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2025-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#907002 A TDC ENGINEERING, INC.
received 2025-03-26
#478900 A NOLTE, MIKE E., INC.
received 1998-08-21
#431384 A UNION PACIFIC RESOURCES COMPANY
received 1994-12-28
Lat 32.216083
Lon -100.414750

Well Details

Well Number
1
Max Depth
7,500 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
2025-06-26

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora