42-353-32663

PRODUCING

BOYD C. E. B

NOLAN County · District 7 · CLEAR FORK INCORPORATED · EVB (PALO PINTO)

RRC Lookup

Permits

1

Max Depth

6,700 ft

First Permit

1999-10-26

Latest Activity

1999-10-26

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2000-02-01

Shut-In

Plugged

P-5 Org Status: Active

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2000-02

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#488837 A CLEAR FORK, INCORPORATED
received 1999-10-26

Well Details

Well Number
1057
Max Depth
6,700 ft
Drill Type
Vertical
County
NOLAN
District
7
Completed
2000-02-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
18,244,679 bbl
Cum Gas (all leases)
3,364,373 mcf
Activities
CSGD/P, G/PUR, OPRS/G, OPRS/O
Total Permits
471

External Links

Live © 2026 Petrora