42-355-31426
Final CompletionTEXON ROYALTY -B- GP
NUECES County · District 4 · DCP MIDSTREAM LP · AGUA DULCE (CONSOLIDATED FRIO)
Permits
1
Max Depth
5,200 ft
First Permit
1979-07-02
Latest Activity
1979-07-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2003-06-13
Shut-In
—
Plugged
2011-03-09
!
EWA / Permit operator mismatch
Scheduling: DCP MIDSTREAM LP ≠ Permit: CHAMPLIN PETROLEUM CO.
Resolved via: scheduling → DCP MIDSTREAM LP
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2011-03
Operator History
originally filed by CHAMPLIN PETROLEUM CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#52042 A CHAMPLIN PETROLEUM CO.
received 1979-07-02
Well Details
- Well Number
- GP1D
- Max Depth
- 5,200 ft
- Drill Type
- Vertical
- County
- NUECES
- District
- 4
- Operator
- DCP MIDSTREAM LP
- Completed
- 2003-06-13
Operator
- Name
- DCP MIDSTREAM, LP
- Location
- DENVER
- P-5 Status
- Y (filed 2018-01-05)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 1