42-355-31767
TEMP ABANDONEDLEHMAN W.F.L.
NUECES County · District 4 · CIMARRON ENGINEERING LLC · MOBIL-DAVID (ANDERSON SEG. -R-)
Permits
4
Max Depth
12,000 ft
First Permit
1981-04-27
Latest Activity
2005-03-15
Lifespan
24 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
1981-08-06
Shut-In
—
Plugged
—
P-5 Org Status: X
EWA / Production operator mismatch
Scheduling: CIMARRON ENGINEERING LLC ≠ Production: CIMARRON ENGINEERING CORP. (reported 2009-05)
EWA / Permit operator mismatch
Scheduling: CIMARRON ENGINEERING LLC ≠ Permit: WHITING OIL AND GAS CORPORATION
Resolved via: scheduling → CIMARRON ENGINEERING LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (4)
Permit Applications (4)
Well Details
- Well Number
- 6
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- NUECES
- District
- 4
- Operator
- CIMARRON ENGINEERING LLC
- Completed
- 1981-08-06
Operator
- Location
- KINGSVILLE
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 508,433 bbl
- Cum Gas (all leases)
- 6,932,664 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 88