42-363-20171
TEMP ABANDONEDBRACKEEN A. H.
PALO PINTO County · District 7 · BACON ENERGY · PALO PINTO CO. REG. (GAS)
Permits
1
Max Depth
2,995 ft
First Permit
2007-10-11
Latest Activity
2007-10-11
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2014-08-16
Shut-In
—
Plugged
—
P-5 Org Status: Delinquent
!
EWA / Production operator mismatch
Scheduling: BACON ENERGY ≠ Production: CROWN EQUIPMENT CO. (reported 2013-02)
!
EWA / Permit operator mismatch
Scheduling: BACON ENERGY ≠ Permit: CROWN EQUIPMENT CO.
Resolved via: scheduling → BACON ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#645458 A CROWN EQUIPMENT CO.
received 2007-09-03
Well Details
- Well Number
- 1
- Max Depth
- 2,995 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- BACON ENERGY
- Completed
- 2014-08-16
Operator
- Name
- BACON ENERGY
- Location
- CISCO
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 42,246 bbl
- Cum Gas (all leases)
- 584,132 mcf
- Activities
- OPRS/G, OPRS/O