42-363-30247

Final Completion

COSTELLO-MITCHELL UNIT 1

PALO PINTO County · District 7 · KADANE OIL COMPANY · PALO PINTO CO. REG. (GAS)

RRC Lookup

Permits

1

Max Depth

1,999 ft

First Permit

1995-12-08

Latest Activity

1995-12-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1983-06-10

!

EWA / Permit operator mismatch

Scheduling: KADANE OIL COMPANY ≠ Permit: TALON PRODUCTION, INC.

Resolved via: schedulingKADANE OIL COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-05

Last Production

2026-03

Operator History

originally filed by TALON PRODUCTION, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#442267 A TALON PRODUCTION, INC.
received 1995-11-27

Well Details

Well Number
3
Max Depth
1,999 ft
Drill Type
Vertical
County
PALO PINTO
District
7

Operator

Location
WICHITA FAL, LS
P-5 Status
Y (filed 1993-03-03)
Total Permits
159

External Links

Live © 2026 Petrora