42-363-31251
Final CompletionJENKINS LEVI
PALO PINTO County · District 7 · J & J OPERATING · PALO PINTO CO. REG. (GAS)
Permits
2
Max Depth
4,300 ft
First Permit
1979-07-19
Latest Activity
1981-08-10
Lifespan
2 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-08-12
Shut-In
—
Plugged
1994-11-11
!
EWA / Permit operator mismatch
Scheduling: J & J OPERATING ≠ Permit: FIRST CALGARY U.S.A., INC.
Resolved via: scheduling → J & J OPERATING
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-11
Operator History
originally filed by FIRST CALGARY U.S.A., INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#129276 A FIRST CALGARY U.S.A., INC.
received 1981-08-10
#53247 A HOOKER, MAURICE C.
received 1979-07-19
Well Details
- Well Number
- 2
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- J & J OPERATING
- Completed
- 1980-08-12
Operator
- Name
- J & J OPER
- Location
- GRAFORD
- P-5 Status
- Y (filed 2000-06-09)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- 4,650 mcf
- Total Permits
- 1