42-363-31765
DOMESTIC USE WELLEDGIN
PALO PINTO County · District 7 · EDGIN GEORGE · PALO PINTO CO. REG. (GAS)
Permits
1
Max Depth
3,000 ft
First Permit
1977-07-06
Latest Activity
1977-07-06
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2002-04-01
Shut-In
—
Plugged
—
P-5 Org Status: S
!
EWA / Production operator mismatch
Scheduling: EDGIN GEORGE ≠ Production: DELANEY OIL AND GAS COMPANY (reported 1998-12)
!
EWA / Permit operator mismatch
Scheduling: EDGIN GEORGE ≠ Permit: SWARTS, GLEN G.
Resolved via: scheduling → EDGIN GEORGE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#2429 A SWARTS, GLEN G.
received 1977-07-06
Well Details
- Well Number
- 2
- Max Depth
- 3,000 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- EDGIN GEORGE
- Completed
- 2002-04-01
Operator
- Name
- EDGIN, GEORGE
- Location
- ABILENE
- P-5 Status
- New (filed 2007-08-02)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf