42-363-31807

BRAWNER

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · HARKEN (CONGLOMERATE)

RRC Lookup

Permits

1

Max Depth

4,456 ft

First Permit

1977-10-24

Latest Activity

1977-10-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1977-10-11

Shut-In

Plugged

2000-06-20

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: KENDRICK OIL AND GAS COMPANY (reported 1998-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: KENDRICK & MULLIGAN O & G INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#6541 A KENDRICK & MULLIGAN O & G INC.
received 1977-10-24

Well Details

Well Number
1
Max Depth
4,456 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1977-10-11

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora