42-363-32105

Final Completion

BRANNON

PALO PINTO County · District 7 · SKYBRIDGE ENERGY LLC · DEATON (CONGLOMERATE)

RRC Lookup

Permits

1

Max Depth

3,990 ft

First Permit

1979-03-27

Latest Activity

1979-03-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-07-23

Shut-In

Plugged

2018-03-22

!

EWA / Permit operator mismatch

Scheduling: SKYBRIDGE ENERGY LLC ≠ Permit: QUINLAN ENGINEERING

Resolved via: schedulingSKYBRIDGE ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#45100 A QUINLAN ENGINEERING
received 1979-03-27

Well Details

Well Number
2
Max Depth
3,990 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1979-07-23

Operator

Location
JACKSBORO
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
5,126 bbl
Cum Gas (all leases)
95,754 mcf
Activities
OPRS/G
Total Permits
1

External Links

Live © 2026 Petrora