42-363-32108

Final Completion

YEATS

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · PALO PINTO COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

4,066 ft

First Permit

1979-04-05

Latest Activity

1979-04-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-06-10

Shut-In

Plugged

1996-11-12

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: YOREK OIL & GAS, INC. (reported 1996-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BUCHANAN, WAYMAN W.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#45859 A BUCHANAN, WAYMAN W.
received 1979-04-05

Well Details

Well Number
2
Max Depth
4,066 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1979-06-10

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora