42-363-32180

Final Completion

GIBSON RANCH UNIT

PALO PINTO County · District 7 · KADANE CORPORATION · B.R.A. (CONGL.)

RRC Lookup

Permits

1

Max Depth

4,500 ft

First Permit

1979-08-22

Latest Activity

1979-08-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-09-28

Shut-In

Plugged

2016-11-07

!

EWA / Permit operator mismatch

Scheduling: KADANE CORPORATION ≠ Permit: KADANE OIL COMPANY

Resolved via: schedulingKADANE CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2017-02

Operator History

originally filed by KADANE OIL COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#56267 A KADANE OIL COMPANY
received 1979-08-22

Well Details

Well Number
1
Max Depth
4,500 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1979-09-28

Operator

Location
DALLAS
P-5 Status
Y (filed 2020-04-03)
Cum Oil (all leases)
3,185,675 bbl
Cum Gas (all leases)
8,920,721 mcf
Total Permits
39

External Links

Live © 2026 Petrora