42-363-32226

Final Completion

DOYLE ARLEY

PALO PINTO County · District 7 · ARLEDGE & YOUNG INC. · BRAZOS EAST (CADDO)

RRC Lookup

Permits

1

Max Depth

4,900 ft

First Permit

1979-10-15

Latest Activity

1979-10-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-11-19

Shut-In

Plugged

1993-08-25

!

EWA / Permit operator mismatch

Scheduling: ARLEDGE & YOUNG INC. ≠ Permit: LIVINGSTON ENERGY CORP.

Resolved via: schedulingARLEDGE & YOUNG INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-08

Operator History

originally filed by LIVINGSTON ENERGY CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#60524 A LIVINGSTON ENERGY CORP.
received 1979-10-15

Well Details

Well Number
1
Max Depth
4,900 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1979-11-19

Operator

Location
WEATHERFORD
P-5 Status
Y (filed 1999-03-06)
Cum Oil (all leases)
81,804 bbl
Cum Gas (all leases)
69,407 mcf
Total Permits
20

External Links

Live © 2026 Petrora